Performance Measurement

Measuring performance is the key for driving dramatic improvements in any organization.  Choosing the right performance measures, or metrics, is essential to hone the focus of improvement project teams.
The key to honing the focus for the project team is to select measurements that are relevant to the level of the organization that is being impacted by the improvement project.  If the team is working on improvements at the work cell, or production line level within the organization having measurements that resonate with the Corporate Level of the organization won’t make much sense.  The measures must be selected that are appropriate for the level of the organization where the improvements are being made.
Examples of performance measures and the level within the organization follow:
Corporate Level
  • Return on Net Assets
  • Market Share
  • Total Stockholder Return
  • Capacity Utilization
  • Economic Value Added
Division Level
  • Customer Loyalty
  • Target Cost Attainment
  • Market Share by Division
  • Order Fulfillment Cycle Time
Business Unit Level
  • Business Unit Revenue
  • Business Unit Margin
  • Quality Cost
  • Process Efficiency
  • Staffing Plan Attainment
Work Cell / Production Line
  • Cycle Time
  • Process Yield
  • Employee Satisfaction
  • Outgoing Quality
A rating scale can be used to help with selecting the Key Performance Metric, or the CTQ (Critical to Quality) Metric, that will drive the improvement at the given level within the organization.  The rating scale follows:
Rating Scale for Performance Measures
Relevance
  1. Not at all linked to strategic objectives
  2. Poorly linked to strategic objectives
  3. Indirectly linked to strategic objectives
  4. Strongly linked to strategic objectives
  5. Directly linked to strategic objectives
Usefulness
  1. Too detailed to provide useful information
  2. Rarely provides useful information
  3. Occasionally provides useful information
  4. Usually provides useful information
  5. Constantly provided useful information
Understandability
  1. Very complex, hard to understand
  2. Understandable with study
  3. Neutral
  4. Fairly easy to understand
  5. Very easy to understand
Availability of Data
  1. Would be very difficult to obtain
  2. Will have to be measured manually
  3. Can be obtained by combining information on different reports
  4. Can be easily derived from information on existing reports
  5. Currently available from existing reports
Overall Average Score
  1. Extremely poor indicator / motivator
  2. Poor indicator / motivator
  3. Average indicator / motivator
  4. Good indicator / motivator
  5. Excellent indicator / motivator
The metric with the highest overall score should be used to drive, monitor, and maintain the gains form the improvement efforts.  Choosing the right performance measures is the key for driving dramatic improvements in any organization.

Tuesday, July 12, 2011

Control Strategy that Works

Maintaining the gains from operations improvements is challenging, but not insurmountable.  It all starts at the beginning of your improvement project before you have made any changes.  The following steps are a guide to make your improvements stick!
  • Before and After Measurements
    • Pick one key performance metric that resonates with the process personnel.
    • Establish your baseline performance before making improvements or changing anything.
    • Track the performance over time for this one metric with a control chart or a run chart to show the before, during, and after improvement stages for the process.
  • Operational Definitions
    • Document what was changed or improved
    • Document the steps taken for the corrective actions that drove the improvement
    • Update or develop work instructions that clearly describe how to do the impacted process activities correctly and consistently.
    • Make sure that the work instructions, or procedures, are U-SMART (Useful, Specific, Measureable, Not Ambiguous, Repeatable, and Terse and to the point).
  • Control Plan
    • Name the owner of the process.
    • Identify where and who will measure your key performance metric.
    • Determine the frequency of measurements and updating of the tracking mechanism (control chart or run chart).
    • If something goes wrong name the corrective action takers.
    • Make a list of corrective action steps based upon the corrective actions that have already been implemented to resolve the past performance issues.
    • Keep all measurements, work instructions, process procedures, and corrective action steps visible for all process personnel to have ready access.
You can now run your process and maintain the gains from your improvements.  The Control Strategy that Works starts and ends with the measurement system.  We know where we are before we make changes and then validate the gains after implementation of corrective actions.  Keep on measuring to maintain those gains!

Thursday, June 16, 2011

Design of Experiments Process


The objectives for conducting a designed experiment are the following:
  • Find the most important factors/variables affecting a response(s).
  • Determine the best settings to improve the response(s) for the important factors.
  • Determine the cost effective settings for the factors that are not important.
  • Provide the required information in a timely, efficient and cost effective manner.
The Elements of an Experiment

The Design of Experiments Process

Benefits
  • Manufacturing Cost Savings
    • Scrap
    • Inspection
    • Rework Losses
    • Capital Material
    • Variation
  • Design Cost Savings
    • Delivery Cycle
    • Engineering Design Charges
    • Assembly Material, Labor and Overhead
    • Total Product Cost
  • Marketing Cost Savings
    • Properly allocate resources
    • Stop spending on Promotions that Don’t Work
    • Better understand what makes Customers choose your business
Key Strengths
  • Robustness against uncontrollable factors
  • Obtains required information in a cost effective manner
  • Identifies factors for cost savings
  • Results are reproducible
  • Can improve quality without incurring capital and material cost increases
  • Separates the Vital Few from the Trivial Many
To get started we offer a Design of Experiments Basics Course

Tuesday, June 14, 2011

Functional Cost Modeling


There are two pieces to a Functional Cost Model.  The first is the Functional Model of the product or process.  The second is a comprehensive cost analysis which includes material, labor, allocated expenses, allocated assets, production processing and supporting processes, outsourcing, shipping, installation, service, warranty, and end of life.  After these two components have been created blending them together yields the Functional Cost Model.

The Functional Model
A functional model comprises the Prime Function, Tier 1, Tier 2, and in some cases Tier 3 sub-functions.  The Prime function for a product, or a service, describes in 10 to 15 words or less just what the product or the service is supposed to do.  Once that “What” for the prime function has been nailed down then the question becomes “How” is the “What” achieved.
The Tier 1 functions provide how statements required to achieve the prime function.  Then the Tier 1 functions become the “What” has to be achieved and the Tier 2 functions provide the how statements.  This “What” “How” relationship continues until the functional tree is completed.

Functional Model for an Elevator System

For processes the functional tree usually gets to the third tier where the process steps are reached.  For products the tiers may go beyond the third tier, or as far as needed until the BOM elements, production process steps, systems, installation processes, or servicing processes are reached.  The BOM elements can be a system, sub-system, or an individual component.

Comprehensive Cost Analysis
If a process is being analyzed each step in the process requires a complete cost breakdown from the customer demand for the service to final delivery of services and any remedial activities.
If a product is being analyzed the data includes all of the costs from product conception to end of product life.  The complete supply chain must be considered.  All outsourced activities must be considered.

Functional Cost Model
The final step in Functional Cost Modeling is gluing the Functional Model and the Comprehensive Cost Analysis together.  Costs are assigned to the Functional Model at the appropriate level whether BOM, process, system, sub-system, or other activity.
Once the functional cost model is complete, roll up the costs, look for the high cost functions, and then attack the high cost functions for possible ways to reduce the costs.  The functional requirements for a product or a service are driven by the voice of the customer.  How we choose to deliver those functions is where the creativity comes into play with the design and thus the cost.
The functional cost model is the basis for the Product Cost Reduction Process and Process Design for Six Sigma.

Friday, May 27, 2011

Ten Different Kinds of Errors


  1. Forgetfulness, because we just weren’t concentrating.  Avoided by checking at regular intervals.
  2. Lack of Understanding, where we jump to the wrong conclusion before becoming familiar with the situation.  Avoided by standardized work instructions and training.
  3. Identification Errors, where we view things too quickly or are too far away to see it clearly.  Avoided by training, vigilance, and just plain paying attention.
  4. Errors made by Amateurs, where the lack of experience gets in the way of doing things correctly.  Avoided by standardized operations and skill building.
  5. Willful Errors, which are often caused by poor judgment, ignoring rules, and taking shortcuts.  Avoided by basic education, training, and experience.
  6. Inadvertent Errors, where we take a mental vacation and absentmindedly make mistakes without even noticing that we did.  Avoided by paying attention, discipline, and standardized operations.
  7. Errors caused by Slowness, where our actions are slowed by delays in judgment.  We just weren’t sure what to do next.  Avoided by building skills and standardized operations.
  8. Errors caused by Lack of Standards, where mistakes are made because specifications, requirements, and instructions aren’t suitable or available.  Avoided by standardized operations, policies, procedures, and work instructions.
  9. Surprise Errors, where the process just isn’t running as expected.  Avoided by preventive maintenance, productive maintenance, and standardized operations.
  10. Intentional Errors, where a few people deliberately make mistakes as in crimes and sabotage.  Avoided by fundamental education and discipline.

Poka Yoke five best practices for Process and Design are:
Process
  1. Guide pins (location and/or size)
  2. Error detection and alarms
  3. Limit switches
  4. Counters
  5. Checklists
Design
  1. Self fixturing
  2. Multi-functional parts
  3. Minimizing part variation
  4. Symmetrical parts
  5. In-sensitive to part variation
Utilizing the best practices of Poka Yoke can lead the way for your work environment to achieve zero defects.

Thursday, May 26, 2011

SMED for Setup Reduction


SMED is an acronym that stands for Single Minute Exchange of Die.  The systematic approach to reaching this nirvana was developed by Shigeo Shingo in the spring of 1950 at Toyo Kogyo’s Mazda plant in Hiroshima, Japan.  He defined a new way of looking at the structure of production by focusing on the relationship between processes and operations.  Here is how to do it.
Shingo defined Processes as:
  • Work
  • Inspection
  • Transportation
  • Storage
Shingo defined Operations as:
  • Setup Operations
    • Preparation
    • After Adjustments
  • Principal Operations
    • Main Tasks
    • Incidental Tasks
  • Marginal Allowances
    • Fatigue
    • Hygiene
    • Operations
    • Workplace
SMED for Setup Reduction is comprised of four phases.
Phase 1
This is the as-is, or current state, situation for the production process where both internal and external setup operations are considered to be the same.  There is no separation.  To understand how to make the distinction between internal and external setup operations requires the capture of baseline information and data.
To get the data and information you can:
  • Conduct work sampling,
  • Conduct interviews with the process participants,
  • but the best method is to videotape, or digitally record an entire setup from start to finish.
Phase 2
Now that the baseline has been established the task is to identify and separate the internal and external setup operations.
Definitions:
Internal Setup Operations
  • What operations for setup must be performed when the equipment or process has to be idle?
External Setup Operations
  • What are the operations for setup that can be performed while current production is taking place before the equipment or process must be shut down and thus idle?
The key to achieving SMED is the ability to distinguish between internal and external setup.
Phase 3
Now that the setup operations have been classified as either internal or external operations it is time to convert internal to external aggressively.  Baseline setup times can be reduced by 30% to 50% or more and this is just the beginning.  Go for it and get even more reductions!
How?
  • Make all the conversions identified in Phase 2.
  • Was anything wrongly classified as internal?
  • Can any of the internal operations be converted to external?
  • What do you mean it can’t be done?  Go for it!
Phase 4
Streamline all aspects of both internal and external setup operations.   In this phase look at each of the operations for setup and look for ways to improve them and reduce the time required to get them done.  Nirvana is Single Minute Exchange of Die.  You might not get there that that is the goal!
Phases 3 and 4 can be worked concurrently.  Shigeo Shingo developed this method, SMED, over a period of nineteen years through examining the theoretical and practical aspects of setup improvement.  He developed the cookbook.  It is up to you to apply it.

Monday, May 2, 2011

Supply Chain Optimization by applying Lean and Six Sigma

A company’s supply chain is its lifeblood.  The opportunities for improvement and change are numerous once identified.  To dramatically improve the speed, flexibility, and cost of the supply chain requires a structured and systematic approach.  Our proven approach follows the DMAIC Six Sigma operations improvement process, integrates Lean principles, and includes the DMADV Design for Six Sigma process as well.
The following outline describes at a high level how to achieve Supply Chain Continuous Improvement.
  1. Mobilize for Improvement and DEFINE the Opportunities
    1. Systematically evaluate and select opportunities focusing on tangible improvement
    2. Build and train teams assigned to specific improvement projects
  2. MEASURE, Monitor, and Analyze Performance
    1. Performance Measurement Indentification
    2. Performance Measurement Tracking
    3. Performance Measurement Monitoring and Analysis
  3. ANALYZEand Diagnose the Supply Chain
    1. Design of Products and Processes DFSS (Excellence, Assembly, Manufacturability, Installation, Service, and Reliability)
    2. Supply of Raw Materials and Components
    3. Conversion and Production
    4. Fielded Product Reliability and Customer Feedback
  4. IMPROVEthe Processes, Products, and Service Delivery
    1. Establish and Implement the Required Actions
  5. CONTROLthe Processes, Products, and Service Delivery
    1. Quality Management System
    2. Monitor the Steady State
Process Predictability Management has applied this process to numerous supply chains with dramatic results.  We can both teach and guide your team to apply these methods to your supply chain.  If you are serious about dramatic and continuous improvement contact us.  We are here to help.